Skip to main content
Two Bathroom Remodels in Anderson, SC
Full Remodels Anderson, SC

Two Bathroom Remodels in Anderson, SC

Two-bathroom remodel in Anderson — new vanities, sinks, faucets, mirrors, tiled tub surrounds to ceiling, exhaust fans, and LVP flooring in both rooms.

December 2025 3-4 weeks

About This Project

The Prioleau family wanted both of their Anderson bathrooms remodeled in one project so the house would be done in a single visit. We removed the existing vanities, sinks, one-piece fiberglass tub/shower units, and old flooring in both rooms. The two bathrooms got new 28-inch and 30-inch vanities with sinks, faucets, mirrors, and vanity lights, and new 60x32 bathtubs with full tile surrounds running all the way to the ceiling. Tile was set over GoBoard or Wedi waterproofing for full moisture protection behind the wall. New exhaust fans went in for better airflow and humidity control, walls and ceilings were prepped and painted with moisture-resistant bathroom paint, and approximately 30 square feet of LVP flooring went down in each bathroom. Two complete, durable bathrooms — same trip, same crew.

Prioleau Family's Goals

Get both bathrooms remodeled in one project — new vanities, new tubs with full tile surrounds, better ventilation, and LVP flooring — so the house is done in a single visit.

Scope of Work

  • Removed existing vanities and sinks in both bathrooms
  • Installed new 28-inch and 30-inch vanities with sinks and faucets
  • Installed new mirrors and vanity lights
  • Removed existing one-piece fiberglass tub/shower units
  • Installed new 60x32 bathtubs
  • Tiled tub surrounds from tub deck to ceiling
  • GoBoard or Wedi waterproofing behind all wall tile
  • Installed new exhaust fans in both bathrooms
  • Prepped and painted walls, trim, and ceiling with moisture-resistant paint
  • Installed approximately 30 square feet of LVP flooring per bathroom

Frequently Asked Questions

How many bathrooms were remodeled?

Two bathrooms were remodeled in the same project for the Prioleau family in Anderson, SC.

What type of waterproofing was used behind the tile?

The tile surrounds were built on GoBoard or Wedi waterproofing — sheet or board systems that protect the wall behind the tile from any moisture that passes through grout joints.

Is it more cost-effective to remodel two bathrooms in the same project?

Usually yes. When both bathrooms are done in one visit, there's one mobilization cost, one set of material deliveries, and overlapping work that shares setup and teardown time. For the Prioleau family in Anderson, combining both bathrooms into a single project saved coordination overhead compared to scheduling them separately.

Project Details

Location
Anderson, SC
Category
Full Remodels
Completed
December 2025
Duration
3-4 weeks
Homeowner
Prioleau Family

Materials Used

  • 60x32 bathtubs
  • GoBoard or Wedi waterproofing system
  • Cement-based grout
  • Moisture-resistant bathroom paint
  • LVP flooring
  • Vanities, mirrors, faucets, and vanity lights

Want a Similar Result?

Get a free, no-obligation estimate for your bathroom project.

(864) 795-0194

Ready to Start Your Project?

Let's discuss your vision. We provide free in-home consultations with transparent, detailed estimates — no pressure, no surprises.